Çalık Enerji
News
To be constructed on Bitaraplık Sayolu (Tarafsızlık Boulevard) and situated on a 14.400 square-meter area in the Capital Town of Ashkhabad, Turkmenistan, the administrative building of Çalık Enerji is now under construction.
To be benefited by all Turkmenistan-based affiliates of Çalık Holding, the administrative building is estimated to be unveiled within one and a half years. The Administrative Building will be situated on a 8.100 square-meter area with 5 floors. The project will be constructed by Gap İnşaat company that operates in Turkmenistan as an affiliate of Çalık Holding.