We, as Çalık Enerji, are among the leading global energy companies with many successful turn-key contracting projects around the world, since the inception of our company in 1998.

projects

Abadan Simple Cycle Power Plant

Abadan Simple Cycle Power Plant

We supplied and mounted all ancillary equipment in addition to all main equipment required for operation of the power plant​ and delivered it to the employer as a turnkey project.

EPC contract includes all conceptual and detailed design, procurement of equipment, construction, and mounting of all mechanical, electricity, instrumental and control systems for the power plant. The contract also comprises operation tests, commissioning and training of employer's staff.

About of Project

Project Title: Abadan Simple Cycle Power Plant

Capacity : 123,6 MW

Equipment : Simple Cycle, GE-PG9161-E (Frame 9E)

Voltage Level : 110 kV ​

​Commencement Date : ​February 2002

Date of Delivery : October 2003

Employer : Ministry of Energy, Turkmenistan

Scope : Lump Sum Turnkey EPC Prime Contractor

Similar Projects

  • Al-Khairat Simple Cycle Power Plant
    Al-Khairat Power Plant Project is reinforced with installed capacity of 1.250 MW as the largest Simple Cycle Power Plant Project of Çalık Enerji and Iraq.

  • Ahal-2 Simple Cycle Power Plant

    We will supply and mount all ancillary equipment in addition to all main equipment required for operation of the power plant, and deliver it to the employer as a turnkey project.

    EPC contract includes all conceptual and detailed design, procurement of equipment, construction and mounting of all mechanical, electricity, instrumental and control systems for the power plant. The contract also comprises operation tests, commissioning and training of employer's staff.

  • Ahal-3 Simple Cycle Power Plant
    The power plant with total installed capacity of 141,7 MW is composed of 3 pieces of about 50 MW GE-LM 6000 gas turbines. LM 6000 turbines are designed in a way to generate power in full capacity only within 10 minutes. The turbines are also important for Çalık Enerji as they will be the first of their kind in Turkmenistan and constructed by Çalık Enerji.

  • Amuderya High Voltage Electricity Transmission / Distribution

    Project Title : Amuderya High Voltage Electricity Transmission / Distribution

    Location : Turkmenabad - Turkmenistan

    Commencement Date : January 2007

    Date of Delivery : March 2007

    Employer : Ministry of Energy, Turkmenistan​

    Scope : Engineering, Procurement, Logistics and Configuration Supervisor

1 /