Aden Simple Cycle Power Plant

Aden Simple Cycle Power Plant

Aden Simple Cycle Power Plant was built in Hiswa Region, located approximately 10 km West of the center of the city of Aden in Yemen. The 60 MW Aden Fast-Track Mobile Power Plant was established next to the existing Hiswa Power Plant by Çalık Enerji in Yemen.

Two GE TM2500+ model mobile gas turbines were used in the Project. All turn-key  engineering, supply, EPC and commissioning works were undertaken by Çalık Enerji.

The power plant was built in only 90 days.

The project is important because it is the first agreement made by Çalık Enerji in the field of mobile power plant and it is also the first project that our company started in Yemen.

 

About of Project
 

Project Title: Aden Simple Cycle Power Plant

Capacity : 60 MW

Equipment : 2 x GE TM2500+

Voltage Level : 33 kV ​

​Commencement Date : ​January 2017

Date of Delivery : May 2017

Employer : Public Electricity Corporation "PEC" / Republic of Yemen

Scope : Lump Sum Turn-key EPC Prime Contractor

Similar Projects

  • Al-Khairat Simple Cycle Power Plant
    Al-Khairat Power Plant Project is reinforced with installed capacity of 1.250 MW as the largest Simple Cycle Power Plant Project of Çalık Enerji and Iraq.

  • Ahal-2 Simple Cycle Power Plant

    We will supply and mount all ancillary equipment in addition to all main equipment required for operation of the power plant, and deliver it to the employer as a turnkey project.

    EPC contract includes all conceptual and detailed design, procurement of equipment, construction and mounting of all mechanical, electricity, instrumental and control systems for the power plant. The contract also comprises operation tests, commissioning and training of employer's staff.

  • Ahal-3 Simple Cycle Power Plant
    The power plant with total installed capacity of 141,7 MW is composed of 3 pieces of about 50 MW GE-LM 6000 gas turbines. LM 6000 turbines are designed in a way to generate power in full capacity only within 10 minutes. The turbines are also important for Çalık Enerji as they will be the first of their kind in Turkmenistan and constructed by Çalık Enerji.

  • Abadan Simple Cycle Power Plant

    We supplied and mounted all ancillary equipment in addition to all main equipment required for operation of the power plant​ and delivered it to the employer as a turnkey project.

    EPC contract includes all conceptual and detailed design, procurement of equipment, construction, and mounting of all mechanical, electricity, instrumental and control systems for the power plant. The contract also comprises operation tests, commissioning and training of employer's staff.

1 /