Çalık Enerji
Projects

We, as Çalık Enerji, are among the leading global energy companies with many successful turn-key contracting projects around the world, since the inception of our company in 1998.

projects

Urban Energy Infrastructure Reinforcement Project In Ashgabat 2 & 3

Urban Energy Infrastructure Reinforcement Project In Ashgabat 2 & 3

The cont. project of AST-1, Execution Of The Works For Second And Third Stage Of Increasing The Reliability Of Power Supply To The City Of Ashgabat project modernized the energy transmission and distribution of Ashgabat in accordance with the modern-day standards and increase the security of supply and capacity utilization. The project is a turnkey project and works finalized as of October 2016 in accordance with the contract.

Main Goals of the Project Are;​

  • Increasing the reliability of power supply and capacity of Ashgabat,
  • Increasing the quality of electrical infrastructure of Ashgabat with the best quality and modern engineering methods,
  • Providing environmental friendly superstructure in line with the Turkmen architecture,
  • Providing an environmental friendly, safe, environment and human health preserved work environment. 

About of Project

Project Title : Execution Of The Works For Second And Third Stage Of Incr​​​​easing The Reliability Of Power Supply To The City Of Ashgabat

​Transformer Substations : 5 pieces of 110 kV,6 pieces of 220 kV, 18 pieces of 35 kV, 43 pieces of 10 kV

Cabling Works: 0,95 km 220 kV, 22,43 km 220 kV Overhead Line, 8,45 km 110 kV, 27,2 km 110 kV Overhead Line, 93 km 35 kV, 2,35 km 35 kV Overhead Line, 418,72 km 10 kV

Monitoring and Management System: SCADA and Control Facilities

Commencement Date : August 2014

Date of Delivery: October 2016​

Employer : City Municipality of Ashgabat, Directorate for the Construction of Critically Important Facilities with the City Municipality of Ashgabat

Similar Projects

  • Al-Khairat Simple Cycle Power Plant
    Al-Khairat Power Plant Project is reinforced with installed capacity of 1.250 MW as the largest Simple Cycle Power Plant Project of Çalık Enerji and Iraq.

  • Ahal-2 Simple Cycle Power Plant

    We will supply and mount all ancillary equipment in addition to all main equipment required for operation of the power plant, and deliver it to the employer as a turnkey project.

    EPC contract includes all conceptual and detailed design, procurement of equipment, construction and mounting of all mechanical, electricity, instrumental and control systems for the power plant. The contract also comprises operation tests, commissioning and training of employer's staff.

  • Ahal-3 Simple Cycle Power Plant
    The power plant with total installed capacity of 141,7 MW is composed of 3 pieces of about 50 MW GE-LM 6000 gas turbines. LM 6000 turbines are designed in a way to generate power in full capacity only within 10 minutes. The turbines are also important for Çalık Enerji as they will be the first of their kind in Turkmenistan and constructed by Çalık Enerji.

  • Abadan Simple Cycle Power Plant

    We supplied and mounted all ancillary equipment in addition to all main equipment required for operation of the power plant​ and delivered it to the employer as a turnkey project.

    EPC contract includes all conceptual and detailed design, procurement of equipment, construction, and mounting of all mechanical, electricity, instrumental and control systems for the power plant. The contract also comprises operation tests, commissioning and training of employer's staff.

1 /