We, as Çalık Enerji, are among the leading global energy companies with many successful turn-key contracting projects around the world, since the inception of our company in 1998.
We, as Çalık Enerji, are among the leading global energy companies with many successful turn-key contracting projects around the world, since the inception of our company in 1998.
COMPLETED
We will supply and mount all ancillary equipment in addition to all main equipment required for operation of the power plant, and deliver it to the employer as a Turnkey project.
EPC contract includes all conceptual and detailed design, procurement of equipment, construction, and mounting of all mechanical, electricity, instrumental and control systems for the Power Plant. The contract also comprises operation tests, commissioning and training of employer's staff.
COMPLETED
Çalık Enerji completed over the construction of Gardabani Combined Cycle Power Plant that is one of the top investments for the Georgian energy industry in recent years.
Projected to contribute to the energy diversity, this project corresponds to the 8% of the Georgia's total installed capacity by year 2015 and has the capacity to meet the 15% of Georgia's energy requirements with the 1,8 billion kilowatts energy it produces in an hour.
The construction of the Gardabani Natural Gas Combined Cycle Project started in October 2013 and completed sooner than expected. The power plant started production on July 22, 2015. After completion of the power plant, Çalık Enerji started the operation of the Gardabani Power Plant in order to generate electricity to Georgia.
Thanks to the importance attached to the occupational health and safety, the project was completed without any loss of time due to occupational accidents.
COMPLETED
The 550 MW Simple Cycle Power Plant was constructed in Al-Khums located 100 km away of Tripoli, the capital city of Libya. The power plant is a turnkey project Çalık Enerji has taken over for all aspects including engineering, construction, mounting, testing, commissioning.
The project was finalized in December 2016 with around 500 people to be employed.
With 1-year guarantee term, the project's maintenance has also been taken over by Çalık Enerji for 12 years.
In the wake of the revolution, Libyan Ministry of Electricity signed the first contract for its own major power generation plant with Çalık Enerji.
Khoms Power Plant generates 6% of the current electricity capacity of the Libya and substantially reduce the energy shortages especially affecting the western side of the country where the population has been gathered. The project is also meet power requirement of Al-Khums in an incessant way.
COMPLETED
Al-Khairat Power Plant Project is reinforced with installed capacity of 1.250 MW as the largest Simple Cycle Power Plant Project of Çalık Enerji and Iraq.
COMPLETED
Gas turbines will undergo intensive care by utilizing technological methods for rehabilitation and modernization of the units within the scope of Turkmenistan Fleet Maintenance Project.
It is Çalık Enerji’s biggest maintenance Project contract that is expected to increase the power generation in the country.
It is Çalık Enerji’s first Project in Turkmenistan to be executed with external financing scheme in collaboration with international credit agencies.
ONGOING
On July 24, 2020, Çalık Enerji won the EPC construction works tender for “Rompetrol CoGen Power Plant” held by Rompetrol Energy S. A., which is the Romanian subsidiary of KazMunay Gas International, the state oil and gas company of the Republic of Kazakhstan. The agreement for the Project was signed on August 19, Wednesday with the Signing Ceremony held via videoconference. The project, which is planned to be completed within 26 months, is the first EPC construction project undertaken by Çalık Enerji, therefore is an important milestone for the Company.
ONGOING
Çalık Enerji is awarded Turnkey Construction Project of Cap des Biches Combined Cycle Power Plant with 300 MW capacity in Senegal.
Signature Ceremony with Çalık Enerji, GE (General Electric) and West African Energy was held in Senegal’s capital city Dakar on 3 October 2020 with participation of Amadou Hott, Ministry of Economic Planning and Cooperation of Senegal.
Being the first and largest combined cycle power plant of Senegal, this Project will be added to our portfolio of projects in Sub-Saharan Africa.
ONGOING
Project Title : Bazian Combine Cycle Power Plant Project
Capacity : 257 MW
Equipment Spec : Combine Cycle, 4 x GE HRSG & 1 x GE STF-D200 STG set
Voltage Level : 132 kV
Commencement Date : September 16 2021
Date of Delivery : November 16 2023
Employer : Taurus Power Generation
Scope : Lump Sum Turnkey EPC Prime Contractor
ONGOING
Çalık Enerji will undertake the engineering, procurement, construction, assembly, testing and commissioning of the Power Plant Project and all related auxiliary equipment and structures within the scope of West Qurna 2, one of the largest oil fields in Iraq, developed and operated by LUKOIL. The contract for the project was signed between LUKOIL and Çalık Enerji on 21 December 2020. The Project is planned to be completed within 34 months.
COMPLETED
750 MW Nainawa Main EPC Contractor
COMPLETED
The power plant with total installed capacity of 146,7 MW is composed of 3 pieces of about 50 MW GE-LM 6000 gas turbines. LM 6000 turbines are designed in a way to generate power in full capacity only within 10 minutes. The turbines are also important for Çalık Enerji as they will be the first of their kind in Turkmenistan and constructed by Çalık Enerji.
In addition, Çalık Enerji took over turnkey construction and mounting of all main and ancillary equipment required for operation of the power plant.
EPC contract includes all conceptual and detailed design, procurement of equipment, construction, and mounting of all mechanical, electricity, instrumental and control systems for the power plant. The contract also comprises operation tests, commissioning and training of employer's staff.
Upon the completion, the project was delivered to Turkmenistan Ministry of Energy for operation.
COMPLETED
The cont. project of AST-1, Execution Of The Works For Second And Third Stage Of Increasing The Reliability Of Power Supply To The City Of Ashgabat project modernized the energy transmission and distribution of Ashgabat in accordance with the modern-day standards and increase the security of supply and capacity utilization. The project is a turnkey project and works finalized as of October 2016 in accordance with the contract.
Main Goals of the Project Are;
COMPLETED
The Tedzani 4 HEPP Project is aimed at increasing the total installed capacity of Tedzani 1, 2 and 3 Hydroelectric Power Plants, located at the distance of 70 km to Blantyre, Malawi's second largest city, by 18 MW. Together with the construction of all water works and power plant buildings under the Project, Çalık Enerji has also undertaken the supply and installation of the hydro-mechanical, electrical and electromechanical equipment on a turn-key (EPC) basis.
COMPLETED
Project Title : Bazian Simple Cycle Power Plant Project
Capacity : 505 MW
Equipment Spec : Simple Cycle, 2 x GE 9F.04 Frame GTG set
Voltage Level : 132 kV
Commencement Date : September 28 2021
Date of Delivery : September 28 2022
Employer : Taurus Power Generation
Scope : Lump Sum Turnkey EPC Prime Contractor
COMPLETED
We supplied and mounted all ancillary equipment in addition to all main equipment required for operation of the power plant and delivered it to the employer as a turnkey project.
EPC contract includes all conceptual and detailed design, procurement of equipment, construction, and mounting of all mechanical, electricity, instrumental and control systems for the power plant. The contract also comprises operation tests, commissioning and training of employer's staff.
ONGOING
All EPC Works within the scope of the High Voltage Electricity Transmission Line Project to be built across Turkmenistan, Afghanistan and Pakistan, wich is one of the most significant projects in Asia, are undertaken by Çalık Enerji. First phase of the Project is 375 km long.
COMPLETED
We supplied and mounted all ancillary equipment in addition to all main equipment required for operation of the power plant and delivered it to the employer as a Turnkey project.
EPC contract includes all conceptual and detailed design, procurement of equipment, construction, and mounting of all mechanical, electricity, instrumental and control systems for the Power Plant. In addition, 110 - 220 kV switchyards were also constructed within the scope of the project. The contract also comprises operation tests, commissioning and training of employer's staff.
COMPLETED
Çalık Enerji will make sure that the Project to Increasing The Reliability of Power Supply to The City of Ashgabat and Ashgabat's energy transmission and distribution network are in compliance with the state-of-the-art technology and enhance supply security and capacity utilization. The project delivered as a turnkey project. AST-1 is the first stage of the project which was completed in December 2015.
Main Goals of the Project Are;
COMPLETED
We supplied and mounted all ancillary equipment in addition to all main equipment required for operation of the power plant and delivered it to the employer as a turnkey project.
EPC contract includes all conceptual and detailed design, procurement of equipment, construction, and mounting of all mechanical, electricity, instrumental and control systems for the power plant. The contract also comprises operation tests, commissioning and training of employer's staff.
COMPLETED
Aden Simple Cycle Power Plant was built in Hiswa Region, located approximately 10 km West of the center of the city of Aden in Yemen. The 60 MW Aden Fast-Track Mobile Power Plant was established next to the existing Hiswa Power Plant by Çalık Enerji in Yemen.
Two GE TM2500+ model mobile gas turbines were used in the Project. All turn-key engineering, supply, EPC and commissioning works were undertaken by Çalık Enerji.
The power plant was built in only 90 days.
The project is important because it is the first agreement made by Çalık Enerji in the field of mobile power plant and it is also the first project that our company started in Yemen.